SOLOGRAVITY

Advancements In Solar way

Green

SOLOGRAVITY

SOLAR Electricity Generation Challenges

  • Solar enegy is one of the most popular way to generate GREEN electricity
  • 1 kilowatt solar plant generates 4 to 6 units per day.
  • Electricity per unit can be as low as 5-6 ₹. Annual revenue is around 12700₹
  • Solar panel cost: 35000₹ + inverter + battery + assembly and wiring + maintenance.
  • It may go upto 1 lakh . Total cost recovery may take 10 to 12 years.
  • Weather variations may affect performance.
  • 1 MW project requires upto 6 acres of land.

SOLUTION IS SOLOGRAVITY

A new Green energy generation method relies on Gravity as the major source, combined with solar energy, resulting in maximum efciency, cost savings, and simple infrastructure.

Methodology

SOLOGRAVITY Anti-Gravity Water Lifting Technology


  • It uses an anti-gravity chamber to reduce value of g=9.8 to 0.
  • The anti-gravity chamber contains water, which becomes weightless and is easy to lift.
  • Water may be raised using a low-powered pump mechanism.
  • Gravity is normalised outside the chamber, giving water its proper weight.
  • Water at height is channeled into a turbine, which generates energy.
  • Water out of turbine is returned to the anti-gravity chamber.
  • Power required to lift water is 70-75% less than for heavy water lifting.
  • Consistent electricity generation with higher efficiency.
  • Infrastructure is simpler, cheaper, and easier to maintain than hydro dams.

SOLOGRAVITY Solar + GRAVITY


Quick Recap

Comparison Other Green Technology


Solar


Parameter Solar SOLOGRAVITY
Technology Green Green
Land size 5 acre/MW 0.4 acre/ MW
life span 25 years 35 years
specific location Open land Underground
Efficiency 20% 80%
Dependancy & Availability for production Sun and wether(8 months) Gravity (ALL THE TIME 24x7)
Active Working time 4 to 5 hrs/day 24hrs/day
Infrastructure Simple Simple
Scalability Easy Easy
Storage bank and inverter required NA
Impact in shadow zone Bad pannel in shadow wont give Power No Impact at all Gravity remains Unchanged otherwise
Primery Cost in Pannel and Battery Civil Work and Turbine
ROI duration Upto 10 years Upto 8 years
Capital cost 5 cr/ MW 10cr /MW
O & M 1 LAKH /year(2%) 1 LAKH/year (1%)

Wind


Parameter Wind SOLOGRAVITY
Technology Green Green
Land size 35 acre/MW 0.4 acre/ MW
life span 20 years 35 years
specific location Mountains cliefs Underground
Efficiency 35% 80%
Dependancy & Availability for production Wind flow(Random upto 12 months) Gravity (ALL THE TIME 24x7)
Active Working time Upto 12 hrs/day 24hrs/day
Infrastructure Modratly High Simple
Scalability Not Easy Easy
Storage bank and inverter required NA
Impact in shadow zone Moderate 2nd Windmill may generate upto 60% No Impact at all Gravity remains Unchanged otherwise
Primery Cost in Windmill and Inverter Civil Work and Turbine
ROI duration Upto 20 years Upto 8 years
Capital cost 7 cr/ MW 10cr /MW
O & M 15 LAKH/year (2%) 1 LAKH/year (1%)

Hydro


Parameter Hydro SOLOGRAVITY
Technology Green Green
Land size 0.6 acre/MW 0.4 acre/ MW
life span 80 years 35 years
specific location River site Underground
Efficiency 90% 80%
Dependancy & Availability for production Rains (upto 8 months) Gravity (ALL THE TIME 24x7)
Active Working time 24 hrs/day 24hrs/day
Infrastructure Heavy Simple
Scalability Not Easy Easy
Storage bank and inverter NA NA
Impact in shadow zone No Impact in water Flow stays Same No Impact at all Gravity remains Unchanged otherwise
Primery Cost in Dam and other Civil work Civil Work and Turbine
ROI duration Upto 10 years Upto 8 years
Capital cost 9 cr/ MW 10cr /MW
O & M 25 LAKH /year (2.5%) 1 LAKH/year (1%)