Parameter | Solar | SOLOGRAVITY | |
Technology | Green | Green | |
Land size | 5 acre/MW | 0.4 acre/ MW | |
life span | 25 years | 35 years | |
specific location | Open land | Underground | |
Efficiency | 20% | 80% | |
Dependancy & Availability for production | Sun and wether(8 months) | Gravity (ALL THE TIME 24x7) | |
Active Working time | 4 to 5 hrs/day | 24hrs/day | |
Infrastructure | Simple | Simple | |
Scalability | Easy | Easy | |
Storage bank and inverter | required | NA | |
Impact in shadow zone | Bad pannel in shadow wont give Power | No Impact at all Gravity remains Unchanged otherwise | |
Primery Cost in | Pannel and Battery | Civil Work and Turbine | |
ROI duration | Upto 10 years | Upto 8 years | |
Capital cost | 5 cr/ MW | 10cr /MW | |
O & M | 1 LAKH /year(2%) | 1 LAKH/year (1%) | |
Parameter | Wind | SOLOGRAVITY | |
Technology | Green | Green | |
Land size | 35 acre/MW | 0.4 acre/ MW | |
life span | 20 years | 35 years | |
specific location | Mountains cliefs | Underground | |
Efficiency | 35% | 80% | |
Dependancy & Availability for production | Wind flow(Random upto 12 months) | Gravity (ALL THE TIME 24x7) | |
Active Working time | Upto 12 hrs/day | 24hrs/day | |
Infrastructure | Modratly High | Simple | |
Scalability | Not Easy | Easy | |
Storage bank and inverter | required | NA | |
Impact in shadow zone | Moderate 2nd Windmill may generate upto 60% | No Impact at all Gravity remains Unchanged otherwise | |
Primery Cost in | Windmill and Inverter | Civil Work and Turbine | |
ROI duration | Upto 20 years | Upto 8 years | |
Capital cost | 7 cr/ MW | 10cr /MW | |
O & M | 15 LAKH/year (2%) | 1 LAKH/year (1%) | |
Parameter | Hydro | SOLOGRAVITY | |
Technology | Green | Green | |
Land size | 0.6 acre/MW | 0.4 acre/ MW | |
life span | 80 years | 35 years | |
specific location | River site | Underground | |
Efficiency | 90% | 80% | |
Dependancy & Availability for production | Rains (upto 8 months) | Gravity (ALL THE TIME 24x7) | |
Active Working time | 24 hrs/day | 24hrs/day | |
Infrastructure | Heavy | Simple | |
Scalability | Not Easy | Easy | |
Storage bank and inverter | NA | NA | |
Impact in shadow zone | No Impact in water Flow stays Same | No Impact at all Gravity remains Unchanged otherwise | |
Primery Cost in | Dam and other Civil work | Civil Work and Turbine | |
ROI duration | Upto 10 years | Upto 8 years | |
Capital cost | 9 cr/ MW | 10cr /MW | |
O & M | 25 LAKH /year (2.5%) | 1 LAKH/year (1%) | |